Posts Tagged Framing

Nov 13

Giving the Family a grand tour

I made a quick stop at the house this weekend the see the fruits of last week’s labour. The framing is now 95% complete with only a few more details on the second floor to finish. Walking through the skeleton of the house is an amazing thing. Last weekend I brought Melissa and the kids over for our first interior walk-around together as a family. Melissa and I made our way upstairs to the catwalk and looked down to the kitchen and dining area with a clear picture in our heads of what the final product will look like. The boys came up after giving the first floor a thorough inspection – They were ecstatic to see their rooms. We moved to the master bedroom to get a feel for the space it provided. The master was the one room we felt a little unsure about because of the space we lost to achieve the double-hieght ceiling over the kitchen and dining room. To compensate for that, the second floor has been cantilevered on three sides. We’re really happy with the way the master has turned out – the extra width makes it perfect for our needs.

Things will likely seem to slow down a bit now as we move into plumbing and electrical. I’ll still make my morning visits and will try to post a little more consistently.

Oct 21

Second Floor Framing

I popped by the house quickly yesterday to check out the progress. It’s at the point where we can walk on the second floor. For the first time we can see what the views will be like, how big the bedrooms are and we start to get a glimpse at what the final exterior shape will be. Exciting times.

One feature we can start to see take shape is the catwalk that over looks the kitchen and dining room – I love how inclusive the open layout has turned out to be, even from the second floor. We lost some space upstairs to accomplish it but we gained a bit of it back by cantilevering out three sides of the upper floor. Upper walls come next.

A few more pics here.

Oct 11

First Floor Framing

With the bulk of the foundation work complete the crew is beginning to move to framing. We all went out to the site this weekend to check it out. The boys are pretty excited for the basement. My father and I will be doing the finishing work there and we have a couple of surprises planned for the them. I’ll go into those details much later since we likely won’t be tackling that until next fall or winter.

The first floor is looking spectacular. We’ve only made a few changes along the way. We switched out one deep wood beam at the front for a shallow steel beam – so that we can have shallow joists under the ensuite shower. Essentially so that the shower floor is depressed and we don’t have a curb, making it much easier for Mel to transfer into the shower.

The other beam is over the large sliding door at the rear of the house so that we don’t cut into the 8 foot height of the door.

More photos here